资讯动态

verify they require inspection and testing of HSMs prior to installation to verify integrity of devi

发布时间:2026/8/21 3:55:58 来源:尧图企业网站定制
29-4.4 Examine documented procedures to verify they require inspection and testing of HSMs prior to installation to verify integrity of device. 贴合29-4.4 测试流程要求,结合我提供给你的文档,客观撰写中英文 Client Response 无任何虚构内容。 我要填client response 依赖哪些文档,以及哪些章节。依据 以文档汇总,比如Doc-1 1,2,3 ; Doc-2 1,2"30.3.a Obtain and examine documentation of inventory control and monitoring procedures. Determine that the procedures cover:* Each production run is associated with a predefined inventory of identified POI devices to be injected or initialized with keys.* Unauthorized personnel are not able to modify this inventory without detection.* All POI devices to be initialized with keys on a production run are identified and accounted for against the inventory.* Unauthorized POI devices subm

读完文章,也想定制专属网站?

尧图设计师 24 小时内与您沟通定制方案

免费获取报价